• Aluminum Light Weight Wheelchair
  • video

Aluminum Light Weight Wheelchair

MODEL NO.:CA963L Aluminum Light weight frame Folding backrest Fixed armrest,Fixed footrest 6" Solid Castor Double cross bar 20" Spoke wheel
  • ShunKangDa
  • Foshan China
  • 40-50 days
  • 2000 pcs per month

Product features:

Frame: it is welded with ultra light aluminum alloy pipe with a diameter of 25.4*2.0 thick, foldable, oxidized surface, light weight, firm, safe and beautiful; Folding back, adjustable seat height

Front wheels: high quality PVC wheels with a diameter of 15cm (6 inches) have good wear resistance; Aluminum alloy front fork, surface oxidation; Flexible;

Rear wheel: solid PU tire steel wheel with a diameter of 50cm (20 inches) is adopted, which is free of inflation, has good wear resistance and vibration damping performance, and has an oxidized bright aluminum alloy handwheel,

Seat back cushion: made of black Oxford cloth, reinforced with canvas and metal protective strips, and sponge to increase riding comfort;

Braking: Aluminum parking assembly is adopted, and the width and braking force can be adjusted at will, which is safe and reliable;

Handrail: high and low handrails that can be lifted back, equipped with PU curved handrail surface and plastic guard plate; It is convenient to get on and off wheelchairs and close to tables;

Type foot rest, equipped with high-strength nylon fiber plastic foot pedal; Black Oxford calf belt, pedal height adjustable and reversible.


Product parameters:

Width:  57

Folding width:28

Seat width: 43

Seat depth: 35

Rear wheel INCH: 20"

Front wheel INCH: 6"

Seat height:49

Length: 94

Height: 92

Backrest height: 42

Packaging: 82*28*77

Pcs/ctn: 1

Maximum weight capacity KGS: 100

NX/GX KGS: 12.5/14

20FCL PCS: 156

40FCL PCS: 382

Certificate:ISO13485/ ISO9001/ TUV/FDA/ CE


Product detail picture:

drive lightweight aluminium wheelchair

  • When is the delivery date?

    Our delivery period is usually 40 to 50 days.Some times if customer needs to rush,we can deliver the goods 5 to 10 days in advance.
  • Quality problem

    We have quality control department and quality inspection department to control the quality of our own products. Each production line has quality control personnel to check the products. Each product will be checked before packaging to reduce product quality problems.

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)

top