top
  • 01

    Quality problem

    We have quality control department and quality inspection department to control the quality of our own products. Each production line has quality control personnel to check the products. Each product will be checked before packaging to reduce product quality problems.

  • 02

    When is the delivery date?

    Our delivery period is usually 40 to 50 days.Some times if customer needs to rush,we can deliver the goods 5 to 10 days in advance.

Get the latest price? We'll respond as soon as possible(within 12 hours)
  • Required and valid email address
  • This field is required
  • This field is required
  • This field is required
  • This field is required