• Delux Foldable Aluminum Rollator With Footrest and Armrest
  • Delux Foldable Aluminum Rollator With Footrest and Armrest
  • Delux Foldable Aluminum Rollator With Footrest and Armrest
  • Delux Foldable Aluminum Rollator With Footrest and Armrest
  • video

Delux Foldable Aluminum Rollator With Footrest and Armrest

Name:Rollator Model No.:CA8882L technical parameters Total width (cm):61 Total length (cm):92 Folding state (cm):26.5 Seat width (cm):45 Front wheel diameter (cm):20 Rear wheel diameter (cm):20 Seat cushion height (cm):53 Backrest height (cm):25 Total height (cm):79-89 Maximum load (Kg):100 Net weight (Kg):9 Carton (cm):61*22.5*86 Unit/box:1
  • ShunKangDa
  • 中国
  • 55days
  • 5000

Product performance and structural characteristics:

The product complies with the Yue Chan Xi Bei No. 20170112 standard: its structural characteristics are as follows;

1. The auxiliary driving system consists of wheels, frame, seat plate, backrest pipe, braking system, pedal, etc. It has the characteristics of lightweight and flexibility. An unpowered walking aid suitable for the elderly and those with walking difficulties for walking and shopping.

2. The main frame adopts φ Made of 25.4 * 1.4 thick aluminum alloy tube with surface painted. There are wooden boards and foam inside the seat cushion, wrapped in PVC. Armrest tube φ 22x2.0 thick, with 6 height adjustment holes. Plastic front fork, 8 inches for front and rear wheels. Equipped with a foldable movable foot pedal that can be lifted up. The backrest tubes can be installed separately in the front and rear for easy use. The brakes can be locked, ensuring overall safety and reliability.

1) Parking performance ≥ 7 °, driving braking performance ≤ 0.5m.

2) All wheels must land smoothly on the ground.

3) Static stability: longitudinal ≥ 15 °, lateral ≥ 6 °.

4) Sliding offset ≤ 350 mm

5) Minimum Radius of gyration ≤ 0.65m

6) Minimum conversion width ≤ 1.5m


  • When is the delivery date?

    Our delivery period is usually 40 to 50 days.Some times if customer needs to rush,we can deliver the goods 5 to 10 days in advance.
  • Quality problem

    We have quality control department and quality inspection department to control the quality of our own products. Each production line has quality control personnel to check the products. Each product will be checked before packaging to reduce product quality problems.

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)

top